Most P2 professionals are adept in recognizing opportunities for organizations to improve their environmental performance. The P2 community may not be so adept at identifying organizations that may be ripe for lean, or lean and environment, or E3 (which is essentially integrating lean and environment, energy, and economic development). This section provides a checklist of conditions you might identify during a walk-through of a facility, which indicate the organization may be experiencing "lean pain" and could benefit from lean and environment and/or E3 projects. If a business appears to have several of these potential conditions listed in the "Lean Pain" Checklist below, they may be ripe for a lean and environment project. For questions about whether a company is a potential candidate, and to determine the right contacts for establishing a lean and environment project team, and ... email PPRC at leangreen@pprc.org or view the "Where to Go for Help" section of this document.
Verbal Cues □ Does the organization express a need or desire to improve productivity and efficiency? Philosophy
□ Disposables: people, materials, product Housekeeping
□ Essential and non-essential items mixed Quality □ Product does not meet specifications, or minimally meets specifications Process Bottlenecks (Line Imbalances)
□ Process steps are not synchronized with each other Process Flow
□ LONG LEAD TIMES (suggest asking what their lead time is) Work-in-Progress/Inventory
□ Accumulation of product elements between process steps Visual Controls
□ Hard to see and understand what is going on in the plant and particularly in a production area Operator Competence
□ Operators not able to run the floor Technology
□ Large machinesThe "Lean Pain" Checklist
□ Do employees express ideas for improvement that have not been implemented and/or they do not feel the management will be receptive to their ideas?
□ Is anyone complaining or bothered about having too much downtime, or waiting on a previous process step?
□ Is anyone complaining about product quality or ergonomic issues?
□ Is anyone complaining or demonstrating that they are not fully trained in a task or skill?
□ Short term results
□ Many "specialists" vs. staff trained in many operations and areas
□ Little investment in workforce skill development
□ Employees stopping work to find a tool, part, or other item they need
□ High defect rate and defect piles or bins
□ A rate-limiting process step that delays or slows down another step or process
□ Scheduling problems
□ Large lot sizes
□ Long start-ups
□ Machine breakdowns
□ Long vendor deliveries
□ Long transportation distances or times
□ Raw materials stored for a long time before use
□ Excess accumulation of final product before shipment
□ Bins not marked, instructions not posted, tool and part storage not labeled
□ Operators not engaged /able to suggest improvements
□ Narrow skill sets
□ Work not "standardized" with consistent, documented methods, and/or operators don’t know what to do or how to do it correctly
□ Capacity-driven
|
The Topic Hub™ is a product of the Pollution Prevention Resource Exchange (P2Rx) The Lean and Environment (and E3) Topic Hub™ was developed by:
Hub Last Updated: 5/7/2013 |
![]() |
P2RIC is a member of the Pollution Prevention Resource Exchange, a national network of regional information centers: NEWMOA (northeast), ESRC (southeast), GLRPPR (Great Lakes), ZeroWasteNet (southwest), P2RIC (plains), Peaks to Prairies (mountain), WSPPN (Pacific southwest), PPRC (northwest). |
| The Nebraska Business Development Center (NBDC) at the University of Nebraska at Omaha (UNO) operates the Pollution Prevention Regional Information Center. | |
| You are on new server. | |
|
P2Ric is fortunate to receive funding from the US Environmental Protection Agency. For more information on the EPA and its programs, please visit http://www.epa.gov |
|||
| All contents Copyright ©2009 P2RIC. All Rights Reserved. | |||